Additions to the Water Pollution Control Plant Rockmart, Georgia Increase treatment capacity from 1.2 mgd to 3.0 mgd
Description of Project: Modifications to the raw sewage pump station; construction of a new grit chamber; construct new sequencing batch reactors; construct new chlorine contact chamber; modifications to existing aerobic digesters; construct maintenance building, blower building and modifications to existing control building.
Scope of services provided: Met with City personnel to discuss scope of project; prepared NPDES Permit application; prepared plans, bid documents and construction specifications; obtained EPD approval of plans and specifications; received construction bids; prepared bid tabulation and letter of recommendation of contract award; prepared contract documents between owner and contractor; conducted preconstruction conference; issued notice to proceed; checked shop drawings; provided on-site resident inspection; reviewed and approved contractors request for payment; provided record drawings to the owner.
Total construction cost: $3,639,565 Completed 1997

|