Ellijay-Gilmer County Water and Sewerage Authority Additions to the City of Ellijay Water Pollution Control Plant Increase treatment capacity to 4.0 mgd.
The Ellijay Water Pollution Control Plant was operating with a permitted treatment capacity of 2.5 mgd and consisted of two primary clarifiers, vertical loop reactors, two additional aeration basins, two final clarifiers (not in service), two circular final clarifiers, a chlorine contact chamber, an aerobic digester, and sludge dewatering equipment.
The plant was operating at 95% of treatment capacity. To increase the plant from 2.5 mgd to 4.0 mgd required modifications to the existing aeration basins, aerobic digester, tertiary filters, additions to the chlorine contact chamber and construction of a new screen structure, aerobic digester and chemical storage area.
Bids were received in November 2006. The construction contract was awarded to H. C. Coleman and Co., Inc. in the amount of $6,688,700.
The project was completed in February of 2009.

|